The Dual Fuel PSV ”Siem Symphony” has been awarded a charter contract with Wintershall Dea in Norway for a 2 wells drilling campaign on the Norwegian Continental Self.

The contract period is estimated between 150 to 200 days and the vessel will commence operation during November 2019.

Siem Symphony, built in 2014, is designed for services to offshore installations and features a dual-fuel engine capable on running on liquefied natural gas (LNG) and marine diesel oil (MDO).

Image courtesy of René Nielsen